Senior Mechanical Estimator Job Summary: The Senior Mechanical Estimator independently develops accurate mechanical estimates by reviewing bid documents, conducting detailed material and labor takeoffs, and preparing clear, comprehensive proposals. This role is the primary technical estimator
Sr. Transportation Supervisor Needed Shift: Mon Fri, Sat as needed - Routes start at 5a. Needs Class A CDL License to drive Tractor Trailer as needed and will supervise up to 20 Local Box Truck Drivers.
Pocket RN, Inc - Support Operations Coordinator PocketRN Inc. Company Overview PocketRN is the first telehealth startup built specifically for nurse-led care, with a mission to close the gap between home and healthcare by enabling patients
About us At ExxonMobil, our vision is to lead in energy innovations that advance modern living while reducing emissions. As one of the world’s largest publicly traded energy and chemical companies, we are powered
About us At ExxonMobil, our vision is to lead in energy innovations that advance modern living while reducing emissions. As one of the world’s largest publicly traded energy and chemical companies, we are powered