Job Description: Please note that this position is not available for visa sponsorship, and we are unable to take over existing employment visa sponsorships POSITION SUMMARY We are seeking a highly motivated and experienced Program Manager
Job Summary The Senior Maintenance Technician is responsible for ensuring the safe, efficient, and reliable operation of a facility’s equipment, systems, and physical infrastructure. The role involves performing preventive maintenance, troubleshooting issues, and completing repairs across
FieldAI’s Irvine team is where embodied AI meets real robots, real sensors, and real field deployments. Based in the heart of Southern California’s robotics ecosystem, we build risk-aware, reliable, field-ready AI systems that solve the hardest
FieldAI’s Irvine team is where embodied AI meets real robots, real sensors, and real field deployments. Based in the heart of Southern California’s robotics ecosystem, we build risk-aware, reliable, field-ready AI systems that solve the hardest
Overview We are seeking a Project Manager – Mechanical Engineering with experience in HVAC systems design, project management, and client coordination to lead projects from pursuit through closeout. This role serves as the primary point of
FieldAI’s Irvine team is where embodied AI meets real robots, real sensors, and real field deployments. Based in the heart of Southern California’s robotics ecosystem, we build risk-aware, reliable, field-ready AI systems that solve the hardest
Responsive recruiter Replies within 24 hours Benefits: Free uniforms Opportunity for advancement Training & development Wellness resources Flexible schedule Soccer Shots is seeking a passionate part-time Youth Soccer Coach to serve children ages 2-8. You’ll laugh.
As a leader and innovator in the snack food industry for over 50 years, J&J Snack Foods provides branded snack foods to foodservice and retail supermarket outlets across the U.S. Its products include such icons as
Job Description The Project Scheduler develops and maintains software schedules for all assigned construction projects within the strategic business unit(s). This role monitors schedule progression against the baseline, explains schedule variances, and prepares reports on schedule-related
Senior Project Controls Cost Engineer PM2CM, Inc., (Project Management to Construction Management) is a professional services company dedicated to providing Program and Project Management, Construction Management, and Project Controls services during the design and construction phase
Program Manager (Provider Relations) CalOptima is the single largest health plan in Orange County, serving 880,000 members, or one in four residents. Our motto Better. Together. is at the heart of our mission to serve members
Project Scheduler The Project Scheduler develops and maintains software schedules for all assigned construction projects in strategic business unit(s). The incumbent monitors schedule progression against the schedule baseline, explains schedule variances and prepares reports on schedule-related
Why Rosendin? Committed. Innovative. Engaged. If you’re looking to take your career to the next level and work with some of the best and brightest in the industry, we want to hear from you. Since our founding
Ready Mix Plant Mechanic/Electrician Starting at $34/hour The Ready Mix Plant Mechanic/Electrician is responsible for the mechanical and electrical maintenance, troubleshooting, and repair of fixed batch plant assets batching systems, cement and fly ash silos, aggregate
Maintenance Mechanic III LISI AEROSPACE is ranked 60th in the global aerospace value chain and specializes in the design and manufacture of high-tech metal components to enhance aircraft safety and performance. Active since 1950 in the
Maintenance Technician Pay Range $23.00 to $28.00/hour Maintenance Technicians work under the supervision of the Facilities Director and are required to perform a wide variety of skilled duties including skilled painting, problems in plumbing, electrical, mechanical. They
Multi-Sport Instructor Benefits: Employee discounts Flexible schedule Opportunity for advancement Starting pay rate: $20.00 per game Job type: Part-time contractor (weekend shifts) Job location: North Inland Empire (rotating seasonal venues) Job summary: i9 Sports is looking
TikTok Shop - Head of Transportation Operations (Fontana) Location: Fontana Employment Type: Regular Job Code: A66535 Responsibilities TikTok Shop Supply Chain & Logistics team is seeking experienced talents. The team is dedicated to innovating and streamlining
Project Manager Take Your Delivery Management Career to the Next Level Kleinfelder, a Forbes Top Employer for Engineers in North America, is committed to a people-first culture, technical excellence, and creating opportunities where employees can thrive!
Maintenance & Facilities Manager Brea, California, United States At Dr. Squatch, were raising the bar on mens personal care with our line of natural, high-performance products. Were on a high-growth, fast-moving ride, continually introducing new product