Maintenance Mechanic - 3091 Assists in the repair and maintenance of equipment or machinery. Job Duties Perform basic routine maintenance on plant equipment and understand basic preventative techniques Diagnose and repair all breakdowns pertaining to machinery, utility
Senior Project Manager Job Category: Professional Requisition Number: SENIO002269 Posted: May 21, 2026 Full-Time Remote Livermore, CA 94551, USA +1 more locations Description Senior Project Manager FLSA Status: Exempt Full-Time Location: Northern or Southern CA (Hybrid-
Project Controls Analyst The Project Controls Analyst is responsible for performing project controls on assigned projects including; project planning and scheduling, and monitoring, risk management and mitigation, change management, and internal and external reporting. Project Controls
Project Controls Specialist Location: Walnut Creek, California Work Arrangement: Hybrid Employment Type: Full-Time Salary Range: $115,000 to $145,000 base salary About the Company Our client is a respected project management, project controls, and technology project management consulting
Assistant Project Controls Specialist The Assistant Project Controls Specialist will support all aspects of project controls and reporting, including, project change management, cost control, progress measurement, schedule development and schedule control. Assist project set-up in the
Project Controls Analyst Grounded in safety, quality, and ethics, our experts lead their fields with dedication, a creative spirit, and a vision for growth. We draw from more than 20 technical specialties worldwide and are devoted
EEG Set Up Technician Job Overview: The EEG Set Up Technician (EEGT) performs in home diagnostic testing on patients, which generates reports for physician interpretations. Responsible for the proper, accurate placement of electrodes on the patient,
Senior Infrastructure Project Manager The Senior Infrastructure Project Manager role works to plan, execute, and oversee projects to completed on time, within budget, while meeting quality standards and health and safety requirements. The role works closely with cross-functional
Senior Analyst, Supply Chain Finance Walnut Creek, CA Built on flavor. Fueled by people. Whats it like to work at Kinders? Well, theres a lot of snacking and geeking out over what we all cooked over the
Construction Project Manager - Transmission & Distribution (California) Walnut Creek, CA Job: Field Construction Management Primary Location: Walnut Creek, CA Schedule: Full-time Travel: Yes, 50 % of the Time Req ID: 260155 Description The Construction Project
About Aardvark Tax Advisors Aardvark Tax Advisors is an AI-native tax, accounting, and advisory firm that combines startup speed with enterprise-grade rigor. We are the accounting and client services arm of Cynch AI, the platform democratizing