Delta Solutions & Strategies is seeking a Journeyman Industrial Engineer to support United States Space Force Space Systems Command (SSC), Space Sensing (SN) activities in Buckley Space Force Base, Colorado. This position will provide systems engineering
At Stellantis, Cost Engineering plays a strategic role in the creation of future vehicles — from early concept to serial production. As we accelerate electrification, software‑defined vehicle development, and innovative manufacturing processes, we are expanding our
Senior EPC Project Planner | Master the Timeline of Complex Energy Projects (Milan Hub) In the world of complex EPC infrastructure and energy assets, a schedule isnt just a list of dates—it is the strategic backbone
TELT è la società italo-francese incaricata dai due stati di costruire e in seguito gestire la sezione transfrontaliera della linea ferroviaria passeggeri e merci Torino-Lione. Con le sue opere in sotterranea e in superficie, il tunnel
Role: Cost Engineering – Metal stamping & welding Location: Paris (France) / Torino (Italy) Experience: 3–5 Years Work Mode: Hybrid Time Zone: Europe Role Overview HCLTech is hiring a Cost Engineer – Metal Structures to support cost engineering
OHB Italia is looking for its Payloads/Equipment Business Units in MILANO or TORINO for immediate start a Payload/Equipment System Engineer (m/f) Ref.PayEquip Sys_2026 You will join a team of System Engineers leading and driving the payload